PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Curtain wall Mullions delivery.jpg Exterior framing at the 2nd floor Facing West.jpg Exterior metal framing at the 2nd floor Facing West.jpg Installed sprinkler head at the 2nd floor Facing North.jpg Installing copper piping at the 4th floor Facing North.jpg Installing electrical split wire above the ceiling at the 2nd floor Facing West.jpg Installing Sprinkler main raiser at the 4th floor Facing North-East.jpg Interior metal framing at the 4th floor Facing West.jpg Metal studs at the 2nd floor Facing West.jpg
Previous pageNext page Installing copper piping at the 4th floor Facing North
Installing copper piping at the 4th floor Facing North